BACKCOUNTRY TRUST - Supporting Aotearoa's Backcountry Heritage
  • Home
  • Grants
    • Apply
    • Guidelines
    • Claims, Payments and Reporting
    • Resources
  • Projects
    • Latest News
    • Volunteer Projects
    • Kaimahi for Nature Projects
    • Photo Gallery
  • About
    • Booklet
    • History
    • Trustees
    • National Operations Manager
    • North Island Project Manager
    • South Island Project Coordinator
    • DOC
    • Sponsors
    • Donations
    • Performance Report
  • FAQ
  • Contact
    • Contact Us
    • Subscribe to Newsletter
  • BCT Owned Huts
    • Mataketake Hut
    • Winchcombe Biv
  • Home
  • Grants
    • Apply
    • Guidelines
    • Claims, Payments and Reporting
    • Resources
  • Projects
    • Latest News
    • Volunteer Projects
    • Kaimahi for Nature Projects
    • Photo Gallery
  • About
    • Booklet
    • History
    • Trustees
    • National Operations Manager
    • North Island Project Manager
    • South Island Project Coordinator
    • DOC
    • Sponsors
    • Donations
    • Performance Report
  • FAQ
  • Contact
    • Contact Us
    • Subscribe to Newsletter
  • BCT Owned Huts
    • Mataketake Hut
    • Winchcombe Biv

LARRIKIN CREEK HUT RENOVATION

13/11/2020

 
Kahurangi National Park, Murchison
October 2020
Picture
LARRIKIN CREEK HUT DWARFED BY THE HAYSTACK
Nestled beside a strip of beech trees beneath the looming limestone bluffs of the Haystack, Larrikin Creek Hut occupies a striking valley head in what could only be Kahurangi National Park. Nearby lies the bluff-fringed Hundred Acre Plateau, also known as the Devils Dining Table.

Built in the 1970s, the standard 4-bunk S81 ex-Forest Service hut featured flat galvanised iron cladding, a corrugated iron roof and water tank. Unlike many other similar huts, it had retained its original open fireplace and steel chimney.

While in reasonably sound condition, damp had crept into the walls beside the fireplace, there was no woodshed, the window frames were deteriorating, and the hut needed re-painting and a general tidy-up. 
Picture
MATERIALS READY FOR FLYING IN AT MURCHISON
​Early in 2020, when calls for interest in the hut appeared on the Backcountry Trust Facebook Page, Ross Cullen from Richmond put his hand up. He assembled a group to restore the hut in two phases.
 
In addition to Cullen, the Phase I team included builders Max Dorflinger, Rod Woodward, Marty Bisdee and Sonny Jim. For Marty and Sonny, (both of Murchison based Ultimate Descents), this was their third restoration project of the year, having earlier completed work on the two huts in the Matakitaki Valley as part of the Kaimahi for Nature funding.
 
The Phase II team included Cullen, Rod Woodward, Bruce Davies and Jane Furkert – a mixture of cavers and New Zealand Alpine Club members.
 
In March, Backcountry Trust manager Rob Brown, Nick Thorpe and Cullen flew with Murchison Heli Tours to Larrikin Creek Hut for an initial assessment. Brown arranged a Scope of Works agreement with DOC, but the Covid-19 restrictions delayed fieldwork. However, by 9th October, three loads of materials and tools were helicoptered onto site, and the Phase I team began work.
Picture
THE PHASE I TEAM AT WORK
​After removing the old roof iron and paper, the team replaced it with new liner and colour steel, as well as a new heavy-duty guttering. They also chose a site for the new woodshed, dug holes and concreted in the piles, began work on the frame, and used some of the hut’s old iron for the roof.
 
The Phase II team began work on 12th October. They completed the woodshed, added snow-braces to the guttering, fabricated a new chimney cowling from the old hut materials, treated the window frames, dug a drainage channel to keep water away from the hut, and prepared the exterior for re-painting. Over the following two days, the team applied the two coats of paint to the exterior, replaced the damp-damaged walls and alcove with new plywood, and cut back vegetation and soil to give the hut better light and airflow.
Picture
DRAINAGE CHANNEL
​After a final tidy-up, and removal of old lead, waste timber and rubbish, Larrikin Creek Hut is set for some years to come. Altogether, the team put in close to 200 person-hours. Many thanks to all involved for a great job.
Picture
AFTER THE FIRST COAT OF PAINT
Picture
NEAR COMPLETION
​Access to Larrikin Creek Hut is from the Matiri Valley, near Murchison, and takes six hours from Matiri Hut, passing Poor Pete’s Hut en route. The newly-refurbished hut offers a superb base for exploring the local plateaux, or climbing the Needle and Haystack.
Picture
OVERLOOKING THE LARRIKIN CREEK BASIN AND THE THOUSAND ACRE PLATEAU BEYOND
>Go Back to Project List

Comments are closed.

    Projects

    March 2023
    February 2023
    October 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    December 2021
    October 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    July 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    March 2019
    January 2019
    June 2018
    March 2018

Quick Links

SUPPORTED BY

Apply for a Grant
Donate to the BCT
View Volunteer Projects
Latest News
Remote Huts Forum and Blog

Picture
Picture
Picture
© BACKCOUNTRY TRUST 2019
Subscribe