The hut was resting on rotting beach logs and the entire floor and sub frame of the hut had to be removed and replaced with new timber and piles. The replacement floor was a 19mm marine grade floor used in many modern huts. The fireplace was also removed and it was replaced with a new wood burner.
|
Projects
August 2024
|